Key points
- Prevention of technical risks : SIL2.
- Optimisation of road and rail traffic.
- Continuity of operation : work carried out while service is interrupted at night.
- Railway signalling : the most complex system in France to date.
Modification and extension of the T3 tram line to serve the “Grand Stade” football stadium
France
Objective : transport 15’000 people per hour before and after every match.
Date 2015
Client SYTRAL
Infrastructure safety